Friday, March 30, 2012

Hard at Work

This has been a very busy studio week for me.  I have been working on the secondary piece for my installation.  A friend is still hedging on letting me use their space for the installation, but I am not worried they usually help out when I need it.  I have been working on my paper as well, besides being the taxi for my kids.  I wish I could get everything out as well as it has been processing in my head on the paper, and I really wish that I had more time because there is another book that I wanted for my research......I guess that it will need to wait until next semester.

Okay here are the photos of my secondary piece.....very close to getting done!



Monday, March 26, 2012

Weaving

I have started doing exactly what the title implies to create a fabric to cover the little couch I am making as another piece for my "living room".  I am just currently waiting for the ok to acquire a space that I can install this huge piece and get it put together into this installation. 
Danielle is going to help me get this documented in a video format so that I can play it in Boston, and we discussed sound and I am getting a looped static sound to play for my TV!!  Excited!
She also thinks that this piece is strong enough for a grant!  I hope that I can get it together and back apart with minimal damages!

Sunday, March 18, 2012

Where does the time go?

This last week and a half I have been continuously producing more bricks and building my first large suspended installation piece.  At this point I have finished covering it with cardboard in which I will be applying the fake bricks.  I got the pieces set together and initially placed the brackets that hold them together so that I can be precise about placing the cardboard and the rigging to hang it.

I got the plexy glass today to use as the face.....4x6', our friend that owns the hardware store gave me a $10 discount and was still $55.

The best news is that Dave (hardware store owner)also owns several other business buildings that he rents, and will let me use a place to install my installation!!!  I was so worried about where I was even possibly going to be able to do this.  He was also the person who allowed me to use a building for 2 months prepping for my thesis show!!

This piece requires a lot of technical junk to get it right!  This is the total size of the main piece and will require about a 12 foot ceiling to install it, but if I have to I guess I could use a 10.  There is still so much to do.